Demolition and renovation demolition

We handle large-scale total demolition or renovation demolition projects, industrial demolition and harmful substance removal with professionalism.

Demolition and renovation site materials to circulation

With Ekokem in charge of the demolition work, the client can be sure that all the demolition waste is treated according to the principle of sustainable development.

Total demolition projects include

  • demolition planning,
  • applying for permits,
  • demolition of buildings and structures,
  • construction waste reuse, recycling and disposal,
  • remediation, reuse and disposal of contaminated soil,
  • remediation and treatment of contaminated water, and
  • the construction of new infrastructures.

We can provide appropriate and efficient tools as well as adequate resources for all demolition needs. We can react to changes in such a way that the client’s plans for further use of the site is not compromised.

Tailored industrial demolition

We handle industrial demolition projects according to the client’s needs, efficiently and in an environmentally friendly manner. Such projects include

  • partial and total demolition,
  • removal of harmful substances,
  • tank, equipment and boiler demolition, as well as
  • stack demolition.

We take the special requirements for renovation demolition into account

We prepare in advance for the changes of plans often faced at renovation sites so as not to endanger the overall project schedule.

Building parts that are in use or will remain so are carefully protected against dust and mechanical damage. We also perform renovation demolition at architecturally protected sites. The demolition site is always carefully cleaned before being handed over to the client for further construction or other use of the site.

Safe removal of hazardous substances

Ekokem is authorised by the Regional State Administrative Agency to perform asbestos removal and dispose of asbestos waste at our reception centres. During the removal work, we pay special attention to protecting the employees and the environment, as well as the complete removal and disposal of the hazardous substances at the site. Work plans are always drawn up in writing for hazardous substance removal projects and submitted to the authorities in advance.

Let’s plan your solution together - Contact us!